Proven Technology. Smarter Delivery.

Clean, Firm Power. Now.

Barge-mounted gas+CCS power plants that deliver clean energy in under 18 months — not the 10+ years the grid demands.

<18
Months to Deployment
95%
Carbon Capture Rate
1GW+
Scalable Capacity

AI Infrastructure Needs Power. The Grid Can't Keep Up.

The Problem

Hyperscalers face 10+ year grid connection queues. This is an existential constraint on AI infrastructure growth. Every month of delay costs billions in unrealized capacity.

10+ Years

Traditional grid timeline

Our Solution

We deliver firm, clean power in under 18 months using factory-built, barge-mounted power plants deployed to sites others can't access — bypassing years of permitting and construction.

<18 Months

Ingo deployment timeline

Ingo Power barge-mounted power plant

Floating Power. Delivered, Not Constructed.

Modular, factory-built power plants on marine hulls. Baseload reliability with the flexibility of gas and integrated carbon capture. Deployed to coastal and inland waterway sites — bypassing years of grid queues.

  • Up to 491 MW Per Barge

    Scalable to multi-GW per site with multiple units

  • 95% Carbon Capture

    Integrated capture systems for net-zero commitments

  • 2-Minute Response

    From cold start to full load — grid-ready flexibility

  • 18-Month Deployment

    Factory-built and delivered — 6x faster than traditional

The world needs 140+ GW of new firm power for data centers by 2030

Four Advantages

Speed

Bypass 10-year grid queues. Our maritime-based approach compresses years of permitting into months.

Sites

Retired coal plants with grid connections intact. No pipeline infrastructure required — sites others can't use.

Manufacturing

Shipyard production eliminates on-site construction risk. Proven supply chain, predictable delivery.

Permitting

Maritime classification compresses years to months. Industrial zoning and existing infrastructure simplify approvals.

Sites in Progress

Pilot Project

24-96 MWe capacity with ~500 MWe commercial phase designed

Grid access validated. Local team in place.

Development Active

UK Site — Parallel Track

Under development

Development Active

Global Pipeline

  • 30 sites identified globally
  • Two sites under active development
  • 15-20 GW total identified pipeline
Aerial view of power plant site

Ready to Talk Power?

Whether you're a hyperscaler facing capacity constraints, an investor interested in clean energy infrastructure, or a potential partner — we'd love to hear from you.

Start a Conversation