Barge-mounted gas+CCS power plants that deliver clean energy in under 18 months — not the 10+ years the grid demands.
Hyperscalers face 10+ year grid connection queues. This is an existential constraint on AI infrastructure growth. Every month of delay costs billions in unrealized capacity.
10+ YearsTraditional grid timeline
We deliver firm, clean power in under 18 months using factory-built, barge-mounted power plants deployed to sites others can't access — bypassing years of permitting and construction.
<18 MonthsIngo deployment timeline
Modular, factory-built power plants on marine hulls. Baseload reliability with the flexibility of gas and integrated carbon capture. Deployed to coastal and inland waterway sites — bypassing years of grid queues.
Scalable to multi-GW per site with multiple units
Integrated capture systems for net-zero commitments
From cold start to full load — grid-ready flexibility
Factory-built and delivered — 6x faster than traditional
Bypass 10-year grid queues. Our maritime-based approach compresses years of permitting into months.
Retired coal plants with grid connections intact. No pipeline infrastructure required — sites others can't use.
Shipyard production eliminates on-site construction risk. Proven supply chain, predictable delivery.
Maritime classification compresses years to months. Industrial zoning and existing infrastructure simplify approvals.
24-96 MWe capacity with ~500 MWe commercial phase designed
Grid access validated. Local team in place.
Development ActiveUnder development
Development Active
Whether you're a hyperscaler facing capacity constraints, an investor interested in clean energy infrastructure, or a potential partner — we'd love to hear from you.
Start a Conversation