Proven Technology. Smarter Delivery.

Clean, Firm Power. Now.

Barge-mounted gas+CCS power plants that deliver clean energy in under 18 months — not the 10+ years the grid demands.

<18
Months to Deployment
90%+
Carbon Capture Rate
1GW+
Scalable Capacity

AI Infrastructure Needs Power. The Grid Can't Keep Up.

The Problem

Hyperscalers face 10+ year grid connection queues. This is an existential constraint on AI infrastructure growth. Every month of delay costs billions in unrealized capacity.

10+ Years

Traditional grid timeline

Our Solution

We deliver firm, clean power in under 18 months using factory-built, barge-mounted power plants deployed to sites others can't access — bypassing years of permitting and construction.

<18 Months

Ingo deployment timeline

Ingo Power barge-mounted power plant

Barge-Mounted Gas+CCS Power Plants

Factory-built in world-class shipyards. Deployed to sites with existing grid connections. Ready for nuclear conversion.

  • 96 MWe Per Barge

    Scalable to 1+ GW per site with multiple barges

  • 90%+ Carbon Capture

    Clean firm power that meets net-zero commitments

  • 18-Month Deployment

    From FID to power delivery — 6x faster than traditional

  • Nuclear-Ready Design

    Platform 2 conversion pathway designed in from day one

How We Deliver

Proven Technology

Engine technology illustration

Established, reliable technologies — gas engines, proven capture systems — to minimize technology risk while maximizing performance.

Innovative Delivery

Barge delivery illustration

Factory-built, barge-based deployment bypasses years of grid connection queues and construction delays. Delivered as a finished product.

AI-Accelerated

AI technology illustration

AI-enabled development tools dramatically accelerate pre-development, cutting timelines from 5 – 7 years down to 2 – 3.

Four Advantages

Speed

Bypass 10-year grid queues. Our maritime-based approach compresses years of permitting into months.

Sites

Retired coal plants with grid connections intact. No pipeline infrastructure required — sites others can't use.

Manufacturing

Shipyard production eliminates on-site construction risk. Proven supply chain, predictable delivery.

Permitting

Maritime classification compresses years to months. Industrial zoning and existing infrastructure simplify approvals.

Deals in Progress.

We are ready to scale. If you're a hyperscaler, infrastructure investor, or potential partner — let's talk.

Netherlands — Pilot Project

24-96 MWe capacity with ~500 MWe commercial phase designed

Active Development

UK Site — Parallel Track

Under development

Active Development

Global Pipeline

  • 10+ sites optioned across USA, Sweden, Ireland
  • 15-20 GW total identified pipeline
  • 13 priority sites analyzed in central Europe (U.S. State Dept funded)
Barge power plant blueprint

Netherlands and UK in progress
Pipeline sites across 5 countries

Ready to Talk Power?

Whether you're a hyperscaler facing capacity constraints, an investor interested in clean energy infrastructure, or a potential partner — we'd love to hear from you.

Start a Conversation